80kWh/ton for copper strip. ECO mode reduces consumption by 12%.
92% oil reuse rate via 3-stage filtration. 15% cost reduction in waste oil treatment.
According GRM TCO calculator template for automated 5-year cost analysis.
48hr domestic delivery. 5 business days for international orders (air freight).
Compatible with OPC UA/MTConnect. Verified integration with Siemens MES.